© Siemens

Erlangen

Siemens Campus

An ambitious project in every respect.

The largest building project currently underway in Germany, the Siemens Campus in Erlangen will cover an area equivalent to 75 soccer fields. In addition to embodying Siemens’ commitment to pursuing carbon-neutral operations, this project is expected to reduce the time required for the project by 20% compared to the original plan. The campus will be the central hub of the city of Erlangen and stand as a monument to Siemens’ ecologically responsible mindset—as well as the possibility of saving time and resources through smarter building practices.

General Facts

Project

Siemens Campus

Location

Erlangen, Germany

Client

Siemens Campus Erlangen Objekt 2 GmbH & Co. KG

Architect(s)

KEC Planungsgesellschaft GmbH, Berlin

Start of construction

tba

Completion

tba

Structural Engineer(s)

BIT Büro für Integrale Tragwerksplanung GmbH, Berlin

Dimensions

Length

58.52 m

Width

58.52 m

Height

20.15 m

Number of floors above ground

5

Number of buildings in total

5

Gross floor area (GFA)

5 x 13,897 m²

Usable floor space

5 x 10,783 m²

Size of CREE system area

5 x 11,243 m²

Plot size

0.27 ha

Additional Information

Structural fire resistance

1.5 hrs

Size of CREE system area

5 x 11,243 m²

Volume of Mass Engineered Timber

5 x 1,389 m³
© Siemens
Siemens Campus Interior© Siemens
Siemens Campus Park© Siemens
Siemens Campus Door© Siemens
Siemens Campus Conference Room© Siemens

We Challenge the Status Quo

We provide a holistic, natural, and simplified way of building for those who are sick of the old way of doing things.